File #: 23-66    Version: 1 Name:
Type: Resolutions Status: Agenda Ready
File created: 1/10/2023 In control: City Council
On agenda: 1/18/2023 Final action:
Title: That the City Manager, or designee, be authorized to sign a Non-Federal Reimbursable Agreement (AJW-FN-CSA-22-SW-005016) between the City of El Paso and the Federal Aviation Administration ("FAA") whereby the FAA will provide oversight of services necessary for construction phases and Engineering support for review of plans and specifications for the relocation of FAA owned Runway End Identification Lights system and cables at Runway 08R due to Taxiway M relocation, and reconfiguration of adjacent connectors and taxiways and runway resurfacing, impacting multiple FAA facilities, equipment, signal and power cables related to airfield projects at El Paso International Airport, El Paso, Texas.
Attachments: 1. FAA Non-Federal Reimbursable Agreement, 2. CC 3 - PP for RA - Multi project r1, 3. 1-18-23 FULLY EXECUTED - FAA AGREEMENT AJW-FN-CSA-22-SW-005016
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

CITY OF EL PASO, TEXAS

LEGISTAR AGENDA ITEM SUMMARY FORM

 

 

DISTRICT, DEPARTMENT, CONTACT INFORMATIOn:

Please choose District and Department from drop down menu.  Please post exactly as example below.

No Title’s, No emails.  Please use ARIAL 10 Font.

Details

All Districts

Airport, Sam Rodriguez, (915) 212-7301

End

 

 

AGENDA LANGUAGE:

This is the language that will be posted to the agenda.  Please use ARIAL 11 Font.

Title

That the City Manager, or designee, be authorized to sign a Non-Federal Reimbursable Agreement (AJW-FN-CSA-22-SW-005016) between the City of El Paso and the Federal Aviation Administration (“FAA”) whereby the FAA will provide oversight of services necessary for construction phases and Engineering support for review of plans and specifications for the relocation of FAA owned Runway End Identification Lights system and cables at Runway 08R due to Taxiway M relocation, and reconfiguration of adjacent connectors and taxiways and runway resurfacing, impacting multiple FAA facilities, equipment, signal and power cables related to airfield projects at El Paso International Airport, El Paso, Texas.

End