File #: 21-241    Version: 1 Name:
Type: Bids Status: Agenda Ready
File created: 2/22/2021 In control: City Council
On agenda: 3/2/2021 Final action:
Title: The linkage to the Strategic Plan is subsection 7.2 - Improve competitiveness through infrastructure improvements impacting the quality of life. Award Summary: The award of Solicitation 2021-0554 Fort Boulevard Improvements to LESNA CONSTRUCTION, INC. for an estimated total award of $312,232.00. This award will support the street improvements of Fort Boulevard Improvements between Justus Street and N. Copia Street. The scope of work will include but not be limited to the demolition of existing sidewalk, driveways and appurtenances, curb and gutter, header curb, milling existing 2" thick asphalt pavement, landscape and irrigation system, installation of concrete stem wall, installation of pedestrian signals. Roadway improvements shall consist of new pavement structure consisting of Hot Mix Asphaltic Concrete (HMAC). Improvements will also include new ADA/TAS compliant sidewalks and ramps. Finally, the improvement project will include a full video image detection system, including el...
Indexes: Goal 7
Attachments: 1. 03022130 SOLICITATION 2021-0554 FT BLVD LESNA CONSTRUCTION.pdf, 2. Item # 30 Fort Boulevard Improvements PPTX.pdf
CITY OF EL PASO, TEXAS
AGENDA ITEM SUMMARY FORM

Details
District 2
Capital Improvement Department, Sam Rodriguez, (915) 212-0065
Purchasing and Strategic Sourcing, Bruce D. Collins, (915) 212-1181
End

PUBLIC HEARING DATE: Click or tap to enter a date.

STRATEGIC GOAL:
Goal 7 - Enhance and Sustain El Paso's Infrastructure Network

SUBGOAL: 7.2 Improve competitiveness through infrastructure improvements impacting the quality of life

SUBJECT:
APPROVE a Resolution / Ordinance / lease to do what? OR AUTHORIZE the City Manager to do what? Be descriptive of what we want Council to approve. Include $ amount if applicable.
Title
The linkage to the Strategic Plan is subsection 7.2 - Improve competitiveness through infrastructure improvements impacting the quality of life.

Award Summary:

The award of Solicitation 2021-0554 Fort Boulevard Improvements to LESNA CONSTRUCTION, INC. for an estimated total award of $312,232.00. This award will support the street improvements of Fort Boulevard Improvements between Justus Street and N. Copia Street. The scope of work will include but not be limited to the demolition of existing sidewalk, driveways and appurtenances, curb and gutter, header curb, milling existing 2" thick asphalt pavement, landscape and irrigation system, installation of concrete stem wall, installation of pedestrian signals. Roadway improvements shall consist of new pavement structure consisting of Hot Mix Asphaltic Concrete (HMAC). Improvements will also include new ADA/TAS compliant sidewalks and ramps. Finally, the improvement project will include a full video image detection system, including electrical conductors, ground box, vehicle and pedestrian signal heads and traffic signal detectors.

Department: Capital Improvement
Award to: LESNA CONSTRUCTION, INC.
El Paso, TX
Item(s): All
Initial Term: 210 Consecutive Calendar Days
Base Bid I: $312,232.00
Total Estimated Award: $312,232.00
...

Click here for full text