File #: 24-492    Version: 1 Name:
Type: Resolutions Status: Agenda Ready
File created: 3/25/2024 In control: City Council
On agenda: 4/9/2024 Final action:
Title: A Resolution to authorize the City Manager, or designee, to sign an Advance Funding Agreement by and between the City of El Paso and the State of Texas, acting by and through the Texas Department of Transportation, for the design and construction of the Surface Transportation Program grant improvements project generally described as Reconstruct Existing Roadway on Sun Valley Street (from Gateway Boulevard North to Kenworthy Street) for a total estimated project cost of $6,176,887.08 of which the estimated local government participation amount is estimated at $477,807.66 plus any cost overruns. Further, that the City Manager, or designee, is authorized to sign all documents, agreement amendments, and perform all actions required to carry out the obligations of the City under this agreement.
Attachments: 1. AFA Sun Valley St Improvements Packet, 2. CC 13 - AFA Sun Valley St Improvements
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

CITY OF EL PASO, TEXAS

LEGISTAR AGENDA ITEM SUMMARY FORM

 

 

DISTRICT, DEPARTMENT, CONTACT INFORMATIOn:

Please choose District and Department from drop down menu.  Please post exactly as example below.

No Title’s, No emails.  Please use ARIAL 10 Font.

Details

District 4

Capital Improvement Department, Joaquin Rodriguez, (915) 212-0065

End

 

 

AGENDA LANGUAGE:

This is the language that will be posted to the agenda.  Please use ARIAL 11 Font.

Title

A Resolution to authorize the City Manager, or designee, to sign an Advance Funding Agreement by and between the City of El Paso and the State of Texas, acting by and through the Texas Department of Transportation, for the design and construction of the Surface Transportation Program grant improvements project generally described as Reconstruct Existing Roadway on Sun Valley Street (from Gateway Boulevard North to Kenworthy Street) for a total estimated project cost of $6,176,887.08 of which the estimated local government participation amount is estimated at $477,807.66 plus any cost overruns. Further, that the City Manager, or designee, is authorized to sign all documents, agreement amendments, and perform all actions required to carry out the obligations of the City under this agreement.

End